  • Iraq Kirkuk~Baiji Pipeline EPC Project

    이라크 Kirkuk~Baiji Pipeline EPC 사업 위치

    • Project overview : Expansion of supply infrastructure in Iraq and large-scale replacement of old pipes.
    • Location : Kirkuk~Baiji northeast of Iraq
    • Order : OPC (Oil Pipelines Company, state-run company in charge of pipe operation in Iraq)
    • Contract Type : EPC Turn-key (KOGAS exclusive contract)
    • Construction size : DRY GAS Line 18" × 110km, LPG Line 16" × 110km, second row parallel construction, 60km × second row engraving construction included
    • Contract Period : October 23, 2012 to December 28, 2014 (End of June 15, 2015)
  • Thailand PTT LNG Re-gasification Terminal Project

    태국 PTT LNG터미널 사업 위치

    • Project overview : The project to build Thailand's first LNG terminal in Rayong, Thailand.
    • Order : PTTLNG Company Limited
    • Consortium : KOGAS, GS Engineering & Construction, Daewoo Engineering,
    • Facility size : 160,000cc storage tank x2 units, vaporization transmission and discharge facility (5 million tons per year)
    • Business period : February 2008 to November 2012
    • KOGAS scope : Technical consulting, training, commissioning
  • Singapore LNG Re-gasification Terminal Project

    싱가포르 LNG터미널 사업

    • Project overview : The project to build Singapore's first LNG terminal on Jurong Island, Singapore.
    • Business owner : Singapore LNG Pte. Ltd.
    • Construction contractor : Samsung C&T.
    • Facility size : 180,000cc storage tank x2 units, vaporization transmission and discharge facility 3.5 million tons per year.
    • Business period : March 2010 to August 2013
    • KOGAS scope : Technical consulting, training, commissioning
  • UAE LNG Re-gasification Terminal Technical Consulting Project

    아랍에미리트 LNG 터미널 기술자문사업 위치

    • Project Overview : LNG Terminal Technical Advisory Project located in Hujaira, United Arab Emirates
    • Business owner : Emirates LNG LLC
    • Facility size
      • Step 1 : FSRU 4.5 million tons per year.
      • Step 2 : FSU + Land vaporization equipment (treatment 4.5 million tons per year)
    • Business period : January 2012 to August 2016
    • KOGAS scope : Technical consulting, technical manual review, technical audit, site supervision
  • China Zhejiang LNG Re-gasification Terminal Project

    중국 저장 LNG터미널 기술자문사업

    • Project overview : Technical consulting project for LNG terminal in Zhejiang, China
    • Business Owner : CNOOC-Zhejiang LNG Co., Ltd.
    • Facility size : 3 storage tanks (160,000 kL), gasification & transmission facility (processing 3 million tons per year)
    • Project period : June 2012 to November 2012
    • KOGAS scope : Technical consulting
  • China Jiangsu LNG Re-gasification Terminal Project

    중국 저장 LNG터미널 기술자문사업

    • Project overview : LNG Terminal Storage Tank Design and Supervision Service Project located in Jangsu, China
    • Business owner : PetroChina LNG Jiangsu Co.
    • Order : HQC.
    • Facility size : 160,000 kL x 3 units, 200,000 kL x 1 unit, vaporization transmission facility (3.5 million tons per year)
    • Business period : August 2012 to August 2015
    • KOGAS scope : Storage tank design, supervision
  • China Qingdao LNG Receiving Terminal Project

    중국 청도 LNG터미널 기술사업

    • Project overview : LNG Terminal Technology Project located in Cheongdo, China
    • Business owners : Sinopec Qingdao LNG Co., Ltd.
    • Facility size : 160,000 kL x 3 units, vaporization transmission facility (3 million tons per year)
    • Project period : January 2013 to August 2013 (training), May 2014 to March 2015 (commissioning, consulting)
    • KOGAS scope : Training, commissioning, O&M consulting
  • Kuwait Al-Zour Re-gasification Terminal Project

    쿠웨이트 알주르 LNG터미널 사업 위치

    • Project Overview : LNG Terminal Construction Project to promote the largest NRP (New Refinery Project) in the Middle East in Kuwait's Al-Zour region and stabilize the supply and demand of power generation energy.
    • Order: KIPIC (Kuwait Integrated Petroleum Industries Company)
    • Consortium : KOGAS, Hyundai Engineering, Hyundai Engineering & Construction.
    • Facility size : 225,000㎘storage tank x 8 units, vaporization transmission facilities (22 million tons per year), 2 mooring facilities, 14 secondary pumps, BOG treatment facilities, Flare facilities, etc.
    • Project period : May 2016 to April 2024
    • KOGAS scope : Commissioning, training, procedure manual preparation
  • England SABIC Ethane Terminal Commissioning Consulting Project

    영국 SABIC Ethane Terminal 시운전 기술자문

    • Project overview : Technical advice for the start-up of the UK SABIC Ethane Import Terminal Project.
    • Business owner : SABIC UK Petrochemicals Limited
    • Order: Samsung C&T (EPC)
    • Facility size : Full container ethane tank (77,000 m3), 2 unloading arms, ……. 1 Flare System
    • Business period : June 2016 to September 2016
    • KOGAS scope : Commissioning consulting
  • China Zhejang LNG Terminal Project Training Service

    중국 저장 LNG 터미널 Marine 교육사업 위치

    • Project overview : Training of personnel at LNG Terminal Marine in China.
    • Business owner : CNOOC Zhejiang Ningbo LNG Co., Ltd.
    • Facility size : 3 storage tanks (160,000 m3),, vaporization facility (3.5 million tons/year)
    • Business period : October 2016 to January 2017
    • KOGAS scope : Training for local staff
  • China Tianjin LNG Terminal Project Training Service

    중국 천진 LNG 터미널 교육사업 위치

    • Project overview: Training at Tianjin LNG Terminal in China.
    • Business owners: Sinopec Tianjin LNG Co., Ltd.
    • Facility size: 3 storage tanks (160,000 kL), vaporization facilities (3 million tons/year)
    • Business period: December 2016 to May 2017
    • KOGAS scope: Terminal operation, training
  • France Dunkirk LNG Terminal Technical Consulting Project

    프랑스 덩케르크 LNG터미널 기술자문 사업

    • Project overview : Technical advice at LNG Terminal in Dunkirk, France.
    • Business owner : IPM DUNE B.V.
    • Facility size : 3 storage tanks (190,000 m3) and 10 transmission facilities ORVs.
    • Business period : January 2019 to December 2021.
    • KOGAS scope : Technical consulting
  • Chile GNL Mejillones LNG Terminal Technical Advisory Project

    칠레 GNL Mejillones LNG터미널 기술자문 사업

    • Project overview : Technical advice for GNL Mejillones LNG Terminal in Chile.
    • Business owner : GNLAMERIS IPM SPA
    • Facility size : 1 storage tank (187,000 m3), mooring facility
    • Business period : July 2019 to July 2020
    • KOGAS scope : Technical consulting
  • China Jiangsu LNG Terminal Storage Tank Design Revieiw Project

    중국 장수 LNG터미널 저장탱크 설계검증사업

    • Project overview : Design verification project of LNG Terminal Storage Tank in Jangsu, China
    • Business owner : CNOOC Gas & Power co. Ltd.
    • Facility size : 4 storage tanks (160,000 m3), 1 mooring facility
    • Business period : July 2019 to January 2020
    • KOGAS scope : Storage tank design review
  • Spain Sagunto LNG Terminal Technical dvisory Project

    Technical advice on LNG Storage tank maintenance at Sagunto LNG Terminal, Spain

    • Project overview : Technical advice on LNG Storage tank maintenance at Sagunto LNG Terminal, Spain
    • Client : SAGGAS
    • Construction size : 150,000cc storage tank x 1 unit
    • Buisiness period : March 2025 to January 2026
    • KOGAS scope : Technical advisory for tank maintenance